If I did it the tools I’d use would be: cnc plasma cutter, press brake, drill press, assorted drill bits, welder, wire wheels, grinder an grinding disks. You are paying for that, and his experience and time. Plus welding wire, and steel. Seems reasonable
$2400 sucks, but it likely needs to be done. I’d be contacting Fleetwood and potentially insurance to see what can be done. If those brackets are what was on there from the factory, that’s a horrible design. Insurance would likely cover the costs and could potentially go after the manufacturer for the bill.
40 year fabricator/25 yr shop owner. Jump on it! I would have charged 3k
1/2 ” is way overengineered
Those pcs should be cut from a PC of rect. Tube, maybe 2x8x1/4 ish
I dont understand why those were not welded on top of the frame too. Without the weld on top they are transferring the load to only the smallest part of the bracket. They were doomed to fail from the start.
Have you tried going through manufacturer
How many bids did you get? I would get more than one and shop around. Sometimes people bid high for whatever reason.
Just get them to re-weld the existing mounts and maybe add some extra metal to reinforce it.